← All projects
Past ProjectK75

So, what next – strip it down, that’s what

So, what next – strip it down, that’s what

So – it ran, however briefly, but it did sit there, a little rough but later I have this down to worn Z Pipe and knackered inlet manifolds – now replaced.

It revved, the clutch engage, the gearbox worked and the rear wheel turned…

So, two options:

Option 1 – Continue to complete and take to an MOT Test

Option 2 – Strip is back to basics, inspect, clean and replace anything duff, repaint frame and bodywork then take to an MOT test.

Which would you choose?

Well, some would choose 1 then perform on ongoing resto, but I wasn’t happy with the Rusty frame and general condition so proceeded to Option 2!

Here’s a few pictures of the breakdown and strip – everything achieved with standard tools, sockets and in a single garage….

I love the K75s engineering, have stripped my RT back to Frame and drive twice before I knew what to undoe and how it came apart…

  1. Undoe all connectors
  2. Undoe four main Pins Frame to Engine
  3. Remove rear Shock
  4. Disconnect rear Brake Caliper
  5. Support the Engine
  6. Walk the Frame off the Engine….

It’s a brilliant design that leaves the Engine and Gearbox and Rear Drive sitting there intact while the Frame and front Wheel scoots off into it’s own world…

g (9)